PROJECTBTF – Microelectronics Production Facility, Dresden
OWNERAMD Saxony LLC & Co. KG, Dresden
CLIENTM+W Germany GmbH
ARCHITECTUNIT4 GmbH & Co. KG, Stuttgart
TYPE OF USEMicro electronics production facility with test-, laboratory areas
SERVICE U4all design phases 1-7 acc. HOAI incl. Field Engineering
DATA BASEGFA: 26.000 m² / BRI: 127.000 m³ / Cleanroom area: 11.500 m²
TIME2006 – 2007
LOCATIONWilschdorfer Landstraße 101 / Dresden
PICSGoggle Earth, UNIT4 GmbH & Co. KG

New building of a new microelectronics laboratory test assembly building / expansion of a microelectronics production facility in Dresden with a clean room area of approx. 5,000 m², including chemical, technical areas and heavy-duty elevator, as well as various media and clean room connecting bridges to the existing buildings.